Foul Water Drainage Design in London

Foul water drainage carries wastewater from toilets, baths, sinks and appliances to the public sewer. When you extend, convert or rearrange a property, the foul drainage often has to be extended, rerouted or upgraded — and it must be designed so it flows correctly and can be maintained.

Residential drainage layout drawing showing pipe runs and manhole positions around a house extension

Scope of work

  • Design of new and altered foul drainage runs
  • Pipe sizing and gradients for reliable flow
  • Manhole and inspection chamber positions for access and maintenance
  • Connection details to existing drains or the public sewer
  • Coordination with proposed bathroom, kitchen and utility layouts

Typical applications

  • Extensions that add bathrooms or kitchens
  • Loft conversions with new ensuite facilities
  • Internal alterations moving toilets or appliances
  • Replacement of old or failing drainage runs

Our design process

  1. 1

    Initial enquiry

    Tell us about your project through the contact form, including any drawings or photographs you already have.

  2. 2

    Review of information

    We review the available information — existing drawings, architectural proposals, site measurements and photographs — and confirm what is needed.

  3. 3

    Quotation

    We agree the scope and fee with you before any design work begins, so you know exactly what will be provided.

  4. 4

    Design and checking

    We carry out the agreed calculations, drawings or specifications, checked against the relevant standards.

  5. 5

    Issue of deliverables

    The agreed drawings, calculations or design notes are issued to you electronically, ready for your builder or building control.

Information we will need

  • Proposed floor plans showing new bathrooms, kitchens or utilities
  • Any existing drainage drawings or survey information
  • Location of existing manholes and the sewer connection
  • Site address for checking public sewer records

Deliverables

  • Foul drainage layout drawings with pipe sizes and levels
  • Manhole and access details
  • Design notes suitable for building control

Limitations and approvals

New or altered connections to the public sewer may need approval from the water authority, and work near a public sewer may need a build-over agreement. These approvals are applied for separately and are not guaranteed. A CCTV survey may be needed where the condition of existing drains is unknown.

Frequently asked questions

Can I move my toilet to the other side of the house?
Usually, yes — but the waste pipe must fall continuously to a drain or soil stack. The design works out the route, gradient and connection point.
Do I need permission to connect to the sewer?
A new connection to a public sewer normally needs water authority approval. We can prepare the design information that supports that application.
Will building control want to see the drainage design?
For most extensions and conversions, yes — drainage is a standard part of a building regulations submission.

Related services

Ready to talk about your project?

Tell us what you need and we'll come back to you about a quotation.

Request a Quote